Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
rb:virginmediafibre [12/04/2018 19:11]
andrew
rb:virginmediafibre [25/04/2018 13:20] (current)
andrew
Line 4: Line 4:
 {{rb:​20180411_182148.jpg?​200|}} {{rb:​20180411_182148.jpg?​200|}}
  
-{{:​rb:​img_20170917_130649.jpg?​200|}}+The new Virgin Media network seems to be a true fibre network, ie. fibre right to the premesis. As a result the digging is to lay blown fibre ducts to all the premises passed. These show a new footway box being constructed. The smaller ducts are to premises and larger oval ones seem to go the distribution cabinets. ​ \\ 
 +{{:​rb:​img_20170917_130649.jpg?200|}} {{:​rb:​img_20170917_130658.jpg?200|}}
  
-{{:​rb:​img_20170917_130658.jpg?​200|}} 
  
 +This is the duct termination point outside each premises. When a subscriber is added, the installers continue the blown fibre duct to the NTE which is fixed to the outside of the premises. This (I assume) converts the fibre to a copper wire. \\
 {{:​rb:​20180411_182411.jpg?​200|}} {{:​rb:​20180411_182411.jpg?​200|}}
  
 +Example of the blown fibre ducts used. \\
 {{:​rb:​20180412_144807.jpg?​200|}} {{:​rb:​20180412_144807.jpg?​200|}}

rb/virginmediafibre.1523560316.txt.gz · Last modified: 12/04/2018 19:11 by andrew